COUNTERTOP FIELDNOTES QUARTZITE SLAB EVIDENCE RECORD — BLANK PLANNING WORKSHEET Blank planning record | Published November 4, 2026 (Oklahoma City time) Use one record per selection. Duplicate for alternatives. Keep this privately; the guide does not collect your answers. Share only with a provider you choose. This is not an order, inspection certificate, warranty or cutting template. Do not use homeowner measurements to approve fabrication. 1. WHAT IS BEING CONSIDERED? Record date / project label: Room / intended use / sunlight or weather exposure: Supplier and contact: Fabricator and contact: Installer, if different: Trade name: Stated geological stone type: Every slab / inventory ID: Thickness / finish: Who will sell the material to whom? Full-slab and detail photo filenames (taken with permission): Sample ID and how it relates to the selected slab: 2. IDENTITY: CLAIM, EVIDENCE, RESULT What the seller calls this stone: What supports that identification (document / assessment / source): Who evaluated it / role / date: Does the evidence apply to these actual slabs? Any conflicting description or unanswered identity question: Who will resolve it, and when? Do not perform scratch, acid or other experiments on showroom slabs or installed tops. Ask the supplier or a qualified stone specialist how to resolve uncertainty. Do not treat a trade name or one observation as a certificate of identity. 3. FINISH AND EXISTING TREATMENTS Known resin, filled areas, mesh backing or previous sealer: Information source / person / date: What remains unknown: Visible feature or concern / photo reference: Professional's assessment of that feature and proposed use: Response of this finished surface to normal spills / approved care guidance: Any assessment or sample evaluation supplied / who performed it / result: Limitations of that evidence: 4. FABRICATION, MOISTURE AND COMPATIBILITY Who assesses absorption and moisture after fabrication? How will readiness for treatment and installation be confirmed? Plan for cut edges, openings and any exposed underside: Drying / curing needs and effect on schedule: Exact proposed sealer, or written reason none is recommended: Current product instructions / version / source: Who confirmed compatibility with existing resin, finish and prior treatments? Required conditions / applicator / application record to be supplied: Compatible installation materials confirmed by / source: Outstanding question / responsible person / due date: A natural-stone label does not establish sealer compatibility. Check the actual product instructions with the responsible professional. Sealing is not a promise against all staining, etching or surface damage. 5. LAYOUT AND FULL PURCHASE SCOPE Layout drawing or marked-photo reference / revision date: Slab assigned to each countertop piece: Features to include or avoid: Seam locations / pattern direction: Edge profile / exposed edges: Sink and appliance models / openings: Final measurement and support responsibility: Who approves changes or substitutions before cutting? Mark each item INCLUDED / EXCLUDED / UNKNOWN and record who provides it: Material and slab quantity: Fabrication and finish: Delivery and installation: Edges / sink and faucet openings / other cutouts: Supports / sink mounting: Existing top removal and disposal: Plumbing disconnection and reconnection: Backsplash work / wall or cabinet repairs: Tax / other charges: Complete quoted total and currency / quote reference / expiry: 6. TERMS, CARE AND OPEN DECISIONS Slab hold owner / expiry / payment terms: Installation booking status (separate from slab hold): Cancellation, return and change terms supplied by: What happens if availability changes or a fabrication issue is found? Care instructions / source / date: Approved cleaner and heat-protection guidance: Sealing reassessment guidance and who to contact: Any written warranty / issuer / coverage / conditions / exclusions: Contact for an unfamiliar mark or installation concern: Open issue | Person responsible | Next step | Needed by: Selection status: [ ] Provisional [ ] Questions resolved [ ] Not proceeding Evidence still needed before a purchase decision: Decision notes / date: Keep written provider instructions and the current proposal with this record. Completing this worksheet does not reserve material, accept terms or approve work.