OKC COUNTERTOP REMNANT PLANNING WORKSHEET Original planning worksheet from Countertop Fieldnotes / okccountertop.com Mark homeowner dimensions APPROXIMATE. This is not a cutting template. PROJECT Room / use: City or ZIP (no street address needed): New surface or replacement: Preferred material / acceptable alternatives: FINISHED PIECES (repeat for each top, backsplash, side splash, etc.) Piece name: Approximate length x depth WITH UNITS: Quantity: Exposed edges and desired edge profile: Pattern direction preference: ACTUAL REMNANT Seller: Seller's piece ID / reference: Material / manufacturer / color: Thickness / finish: Usable dimensions and shape (fabricator to verify): Areas or conditions requiring inspection: Current availability confirmed by / date: CUTOUTS AND SITE Exact sink model and mounting style: Exact faucet and accessory models / hole requirements: Who checks cabinet fit and required clearances: Who determines and supplies countertop / sink supports: Laundry appliance clearance and service-access questions: Final measurement and layout approval by: WRITTEN SCOPE: INCLUDED, EXCLUDED, OR UNKNOWN Material and every finished component: Templating / layout: Cutting / edge finishing / openings: Support work: Delivery / access / installation: Existing-top removal / disposal: Sink mounting / plumbing / wall work: Taxes / payment stages / changes / warranty: RESERVATION Exact piece covered: What creates the hold: Hold expiry: Layout approval required before hold: Terms if final measurements do not fit: Cancellation / refund / damage terms: Separate fabrication / installation schedule confirmation: OPEN QUESTIONS 1. 2. 3. Contact suppliers directly for stock and reservation terms. This independent planning worksheet does not reserve material, book work or obtain a quote.